Pinellas County building permits: St. Pete, Clearwater and beyond
Pinellas County building permits explained: county vs city departments, the Access Portal, setbacks, the 49% flood rule and what a project needs.
Last reviewed November 2026
A Pinellas County building permit comes from the county only if your home is in unincorporated Pinellas or one of a handful of small cities the county serves. St. Petersburg, Clearwater, Largo, Dunedin and most other cities issue their own permits, through their own portals and with their own rules for flood zones and zoning.
Because Pinellas is so built out and so close to the water, permits here come with two extra questions you may not face inland: how close to the property line you can build, and whether the work triggers the flood rule. This guide covers both.
Who issues your permit in Pinellas
Start with your parcel, not your mailing address. Palm Harbor, for example, has no city government, so it’s unincorporated county. Parts of Largo, Seminole and Clearwater are inside city limits and parts are county pockets.
According to Pinellas County, its Building and Development Review Services serves:
- Unincorporated Pinellas County (Palm Harbor, East Lake, Lealman and the unincorporated pockets around Largo, Seminole and Clearwater)
- Belleair Beach, Belleair Shore, Indian Rocks Beach and Kenneth City
- Oldsmar and Safety Harbor
The county asks residents of those partner cities to contact their city first about local requirements such as zoning.
Everyone else goes to their city:
| City | Who issues building permits | Notes |
|---|---|---|
| St. Petersburg | City of St. Petersburg Construction Services & Permitting | Applications and inspections through the city’s online permit portal (building permits) |
| Clearwater | City of Clearwater | Online applications through the city’s Accela online permitting system, limited to licensed contractors and design professionals (get a permit) |
| Largo, Dunedin, Pinellas Park, Tarpon Springs, Seminole | Each city’s building department, inside city limits | Unincorporated pockets go to the county |
Pinellas County keeps a current list of building departments in Pinellas County if your city isn’t shown here.
Applying through the Pinellas County Access Portal
For addresses the county serves, every application goes through the Pinellas County Access Portal. You create a free account, start an application, upload plans, pay fees by card and schedule inspections in the same place. Anyone can look up the status of an application without an account.
The county lists Building and Development Review Services at (727) 464-3888 and an in-person office at 440 Court Street in Clearwater. Some quick permit types, such as window and door replacement, are available online only to licensed contractors. Owner-builders can apply for those in person.
What needs a permit
The state rule is the same everywhere in Florida: you need a permit to build, alter, repair or demolish unless the law exempts the work (s. 553.79, Florida Statutes). Cosmetic work like paint, flooring, cabinets and tile generally doesn’t need one. Plumbing moves, new circuits, wall changes, windows and doors, re-roofs, air conditioning and every addition do.
Florida also lets single-family owners request a written exemption for small jobs under $7,500, but not for electrical, plumbing, structural, mechanical or gas work, and not for homes in a flood hazard area. In coastal Pinellas, that last condition rules it out for a lot of homes. Our Hillsborough County building permits guide walks through these rules in more detail, and they apply the same way here.
Setbacks: how close you can build
Setbacks are the minimum distances between a structure and your property lines. They come from zoning, not the building code, and they vary by zoning district, by city and by the type of structure. Corner lots, waterfront lots and lots with easements often have extra limits.
For an addition, a detached garage or a lanai enclosure that extends the footprint, setbacks usually decide how big the project can be. That’s why every project we design starts with your property survey and a zoning check for your exact parcel. Lot coverage and impervious-surface limits can matter as much as the setbacks themselves on smaller Pinellas lots.
The 49% flood rule in Pinellas
Much of Pinellas sits in mapped flood hazard areas, and the substantial improvement rule shapes a lot of remodels here.
Pinellas County’s substantial damage and improvement page sets the threshold at 49%: if the cost of work on a home in a flood hazard area is 49% or more of the structure’s value (not counting the land), the whole home has to be brought up to current flood standards, which often means elevating it. The national FEMA minimum is 50%, so the county’s rule is a little stricter. The county’s page applies to unincorporated areas; residents of cities are directed to their city.
Cities set their own thresholds and procedures. Before you design a large remodel in St. Petersburg, Clearwater, Dunedin or another city, ask that city’s floodplain office which threshold applies and how it values the structure. St. Petersburg lists Floodplain@stpete.org for flood zone questions.
One more change worth knowing: a 2025 state law, s. 163.31795, Florida Statutes, bars local governments in the flood insurance program from adopting or enforcing “lookback” rules that add up improvements over several years. Some local forms still describe older cumulative rules, so confirm how your department counts past permits. Our post on the FEMA 50% rule explains how the math works and how a remodel can be scoped around it.
What a permit application includes
For a typical remodel or addition, plan on:
- The application, with the contractor’s license on file or an owner-builder disclosure
- Plans drawn to scale, and signed and sealed drawings for structural work
- A survey and site plan for anything that changes the footprint
- Product approvals for windows, doors and roofing
- Energy forms and a load calculation if air conditioning changes
- Flood documentation (such as an elevation certificate and a cost estimate) in a flood hazard area
- A recorded Notice of Commencement before the first inspection on most jobs
Pinellas towns we work in
We build across Pinellas County. Our town pages list who issues permits in each one: St. Petersburg, Clearwater, Largo, Palm Harbor, Dunedin, Seminole, Pinellas Park, Tarpon Springs, Oldsmar and Safety Harbor.
Planning something specific? See room additions in Clearwater, room additions in St. Petersburg or room additions in Largo, or start with our room additions page. We prepare the drawings, apply with the right department, answer plan-review comments and schedule every inspection.
Common questionsQuestions
Does Pinellas County issue permits for St. Petersburg and Clearwater?
No. St. Petersburg, Clearwater and most other Pinellas cities run their own building departments. Pinellas County's Building and Development Review Services handles unincorporated areas plus Belleair Beach, Belleair Shore, Indian Rocks Beach, Kenneth City, Oldsmar and Safety Harbor.
How do I apply for a Pinellas County building permit?
For addresses the county serves, applications go through the Pinellas County Access Portal. You create a free account, start an application, upload plans and pay fees online. The county lists Building and Development Review Services at (727) 464-3888.
What are the setback requirements in Pinellas County?
Setbacks depend on your zoning district and on whether you're in a city or unincorporated county land, and accessory structures can have their own rules. The surest way to know is to check your zoning and compare it with your property survey before anything is designed.
Is the flood rule in Pinellas 49% or 50%?
Pinellas County uses 49% for unincorporated areas and the communities it serves: if the cost of work on a home in a flood hazard area is 49% or more of the structure's value, the whole home must meet current flood standards. FEMA's national minimum is 50%. Cities set their own threshold, so ask your city's floodplain office.
Can a homeowner pull a permit in Pinellas County?
Yes, under Florida's owner-builder exemption for your own home. Pinellas County offers some express permits online only to licensed contractors; owner-builders can apply for those in person.